LongueAttente
Participant
- Inscrit
- 30 Oct. 2005
- messages
- 54
- Score de réaction
- 0
- Localisation
- Colombes - France
- Véhicule
- Ex PII 2004 - PIII Lounge Solar
contruction d'une nouvelle usine de production de batteries pour véhicules hybrides :
Panasonic EV Energy Plans HV Battery Plant in Miyagi Prefecture
KOSAI, Shizuoka Prefecture—Panasonic EV Energy Co., Ltd. (PEVE) announced today that it plans to establish a plant in Japan’s Miyagi Prefecture to increase PEVE’s supply of batteries for hybrid vehicles.
Details are as follows:
1. Prospective location: Taiwa Ryutsu Kogyo Danchi (logistics & industrial
park), Taiwa-cho, Kurokawa-gun, Miyagi Prefecture
2. Start of operations: Beginning of 2010 (scheduled)
3. Product lineup: Nickel-metal hydride batteries for hybrid vehicles
4. Production capacity: Approx. 200,000 battery packs a year (approx. 100,000 packs a year at start-up)
5. Investment: Approximately 30 billion yen
The new plant is expected to create approximately 300 jobs.
KOSAI, Shizuoka Prefecture—Panasonic EV Energy Co., Ltd. (PEVE) announced today that it plans to establish a plant in Japan’s Miyagi Prefecture to increase PEVE’s supply of batteries for hybrid vehicles.
Details are as follows:
1. Prospective location: Taiwa Ryutsu Kogyo Danchi (logistics & industrial
park), Taiwa-cho, Kurokawa-gun, Miyagi Prefecture
2. Start of operations: Beginning of 2010 (scheduled)
3. Product lineup: Nickel-metal hydride batteries for hybrid vehicles
4. Production capacity: Approx. 200,000 battery packs a year (approx. 100,000 packs a year at start-up)
5. Investment: Approximately 30 billion yen
The new plant is expected to create approximately 300 jobs.
Le résumé : Un renforcement de la production des batteries en 2010 pour essayer de suivre la demande : +200000/ans
